General Intelligence Holdings
Founding Head of Power Development — Grid & Data Centres

How your CV stacks up
Upload your CV to see how well it fits this job role
?%
Founding Head of Power Development — Grid & Data Centre
UK / Europe | Full-time preferred | Significant equity
General Intelligence Infrastructure is building a technology-enabled powerbank for AI infrastructure.
We use geospatial intelligence, grid data, industrial-site information, and AI-assisted imagery to identify overlooked routes to large-scale power across European industrial assets.
But finding apparent power is only the beginning.
We need the person who can tell us whether it is real.
We are looking for a senior grid/HV infrastructure professional to join the founding team and own the technical path from:
“This site may have 50MW”
to:
“This is the documented, technically credible capacity, this is what must happen to use it, this is the capex, and this is the realistic energisation date.”
You will:
- Assess industrial sites for genuine power potential
- Review connection agreements, single-line diagrams, utility correspondence, and historic electrical demand
- Understand existing and potential import capacity
- Assess substations, transmission connections, and HV infrastructure
Reasons to use Rodeo
I’m in my final year doing Economics and I don’t know whether to apply for grad schemes now or do a masters first. What do you think?
Honest answer — it depends on where you want to end up. A lot of top grad schemes (Big 4, civil service, banking) don’t need a masters. Let’s look at the ones you’d be competitive for now, and we can decide if a masters actually adds anything.
Also worth knowing: most autumn 2026 applications are open now. Timing matters more than you think.
Start with a chat, not a search bar
Grad scheme, placement, apprenticeship? Not sure what you want yet — that's fine. Your agent talks it through with you and turns "I have no idea" into a shortlist.
Graduate Consultant — 2026 Scheme
Why you're a good match
StrongYour economics background and your summer at a regional bank line up with what PwC looks for on the consulting scheme. Applications close in four weeks.
See breakdownIt searches the market for you
Every day your agent scans the market matching roles against what actually matters to you, not just keywords on a CV.
Why you're a good match
You’ve got the grades and the economics background, and your bank internship is exactly the experience this scheme looks for. Apply soon — deadlines close within the month.
Experience fit
Your summer at the bank plus your econometrics coursework map directly to the day-one responsibilities on this scheme — client modelling, market briefings, and deal support.
Only hits
No noise. No "maybe this fits." Just roles with a clear explanation of why they're right — and where to focus when applying.
Engage with DNOs, NESO, utilities, and specialist consultants
- Determine realistic time-to-power
- Identify technical and grid risks before GII commits capital
- Help define GII’s site-scoring and Time-to-Compute methodology
Work directly with owners, data-centre developers, and project-capital partners
- Help GII secure and develop its first controlled MW
- Ultimately build GII’s European power-development capability
Ideal background
You may currently work for:
- A data-centre developer/operator
- National Grid / NESO / a DNO
- An HV/substation engineering company
- Utility development
- Transmission/distribution infrastructure
- A power engineering consultancy
- A hyperscaler infrastructure team
We are particularly interested in experience with:
- 33kV–400kV systems
- 132kV+ grid connections
- Substations
- Connection applications/offers
- Large-load development
- Data centres or mission-critical infrastructure
- Industrial electrical systems
- Technical due diligence
- UK grid regulation and processes


Get help with your application
Your very own career expert that helps elevate your application to the next level.
You do not need to be a software engineer.
You do need to be able to walk onto an unusual industrial site, interrogate the evidence, and tell us what is real.
Why GII
AI infrastructure is increasingly constrained by time-to-power.
We believe substantial electrical infrastructure built for Europe's previous industrial era can be systematically identified, validated, and redeployed for its next one.
GII is building the technology and development capability to do that at scale.
You would join at the beginning and have meaningful influence over the company, methodology, and project pipeline.
To apply
Send a short note explaining the largest or most complex grid/power project you have worked on and what you personally owned.
“It took my CV and asked me questions relevant to understanding what kind of jobs to suggest for me. Suggestions were almost perfect. Jobs were exactly what I’ve been looking for.”
Jessica, London
Skills
Location