Rodeo
Get started

Aquajet Systems LatAm & Caribbean

From sub-surface to sub-zero

Norton sub Hamdon
Posted about 6 hours ago
Sign up to applySee more jobs like this

How your CV stacks up

1Upload CV
2Analyse CV
3Improve CV

Upload your CV to see how well it fits this job role

?%

Hydrodemolition Techniques at Jäpströmmen Hydropower Station

Hydrodemolition techniques are being used for the refurbishment contract on Sweden’s Jäpströmmen hydropower station dam wall and three spillway gates using Aquajet’s Aqua Cutter robotic hydrodemolition equipment; including underwater operations and night-time temperatures of -25ºC.

Swedish Hydrodemolition Specialist E-Schakt

Swedish hydrodemolition specialist E-Schakt has started work on the major refurbishment contract for the concrete dam and three spillways of the Jäpströmmen hydropower station, some 80 km west of Ostersund, mid-Sweden; to meet increased water volumes.

Dam Details

Built in 1944 and located on Lake Kallsjön, the dam walls and concrete structures of the three spillway gates have badly deteriorated as a result of poor initial construction methods and materials and subsequent maintenance.

The region experiences severe sub-zero temperatures throughout the winter creating considerable ‘frost and ice’ damage across the concrete faces with extensive cracking.

Major moss growth on the concrete walls in the summer months has further aggravated the situation resulting in further water seepage into the concrete fissures.

Contract Details

A two-year contract has been awarded to Skanska for the complete refurbishment of the dam walls, gate structures, and three spillway gates, by Fortum, the private company operator of the power station supplying power into the country’s national grid.

Start of Phase 1

E-Schakt was awarded a 3-phase sub-contract with work on Phase 1 starting in September 2009 for the concrete removal on the top slab and down-side wall of the dam, plus the gate 3 structure; all demanding hydrodemolition techniques.

Skanska will then replace the treated areas with new concrete and where necessary, new rebar, ready for E-Schakt to start Phase 2.

This is scheduled to start in May 2010, again using hydrodemolition on the lake-side dam wall, including underwater operations and gateway 2.

The third 12-week contract is planned for November 2010 and will include gate 1 plus the removal of a small fourth gate and replaced by a new dam wall structure.

Benefits of Hydrodemolition Techniques

Use of hydrodemolition techniques ensures no rebar damage, minimized risk of good concrete removal, eliminates dust and crystalline silica pollution, and leaves a superior bonding surface. It is also substantially faster than mechanical removing methods and is also considerably less labor-intensive.

Reasons to use Rodeo

I’m in my final year doing Economics and I don’t know whether to apply for grad schemes now or do a masters first. What do you think?

Honest answer — it depends on where you want to end up. A lot of top grad schemes (Big 4, civil service, banking) don’t need a masters. Let’s look at the ones you’d be competitive for now, and we can decide if a masters actually adds anything.

Also worth knowing: most autumn 2026 applications are open now. Timing matters more than you think.

Start with a chat, not a search bar

Grad scheme, placement, apprenticeship? Not sure what you want yet — that's fine. Your agent talks it through with you and turns "I have no idea" into a shortlist.

P

Graduate Consultant — 2026 Scheme

PwC·London, UK
£35,000/yr

Why you're a good match

Strong

Your economics background and your summer at a regional bank line up with what PwC looks for on the consulting scheme. Applications close in four weeks.

See breakdown
Save jobNot relevant
View details

It searches the market for you

Every day your agent scans the market matching roles against what actually matters to you, not just keywords on a CV.

Why you're a good match

You’ve got the grades and the economics background, and your bank internship is exactly the experience this scheme looks for. Apply soon — deadlines close within the month.

See breakdown
Strong

Experience fit

Your summer at the bank plus your econometrics coursework map directly to the day-one responsibilities on this scheme — client modelling, market briefings, and deal support.

See breakdown
Strong

Only hits

No noise. No "maybe this fits." Just roles with a clear explanation of why they're right — and where to focus when applying.

Hydrodemolition Equipment

E-Schakt is using hydrodemolition equipment from Sweden’s Aquajet Systems and includes an HVD Evolution Aqua Cutter robot, an Aqua Frame for underwater operations, and a PP-700 Ecosilence power pack.

Dam Wall

Featuring a total length of 41.8 m, the all-concrete dam structure has a maximum height of 14 m, a 2.5 m wide top slab, and 6 m wide base.

In Phase 1, E-Schakt has removed 500 mm depth of concrete from the top slab and within a five-week period virtually completed the hydrodemolition of the dam’s dam-side wall to a depth of 200 mm; using both the Aqua Cutter robot and Aqua Frame for the angled face.

A key feature of the Aquajet robot has been, according to E-Schakt’s site foreman, Andreas Nordström, the ability to undertake geometric triangular cuts – a unique feature of Aquajet Systems.

With three triangular sections of the wall ‘face’, each measuring 4 m x 2 m, the system eliminated the need for time-consuming alternative methods.

“Another advantage has been the 12 m high mast which has allowed us to work at the maximum height.”

A 1 m deep channel excavated along the dam ‘face’ will provide access for the Aqua Cutter robot to continue removing deteriorated concrete below the ground level.

During the second phase contract, E-Schakt will remove 5.5 m of concrete on the vertical element of the upstream side of the dam to a depth of 200 mm; including at least 1 m underwater.

For this operation, the Aqua Frame robot will be positioned on the vertical upstream dam wall and be secured to the wall by divers. Then, in close collaboration with the Skanska divers, the E-Schakt operator can continue the underwater hydrodemolition operation remotely from above the surface.

The Aqua Frame includes 8-meter side rails with a 4-meter traverse rail to support the oscillating lance in the traversing power head with its nozzle to continue operating at 1000 bar at a rate of 260 l/min – 330 l/min depending on the removal depth.

Spillway Gates

The Järpströmmen installation features three steel spillway gates, one with a gate well and two without a well, featuring concrete slab spillways.

The three gates provide a total length of almost 60 m and a maximum height of 16 m.

Get help with your application

Your very own career expert that helps elevate your application to the next level.

Get help applying for this job

Throughout each of the three phases of refurbishment, a single gate will be removed in turn for blasting and retreatment. Hydrodemolition techniques on all concrete structures to the gates will follow removal of the gate.

This aspect would normally provide problems for contractors with the numerous angles to be treated but, says Andreas Nordström, “It is the trickiest element but we are confident that the Aquajet’s unique control system will help us to remain on schedule.”

In total, the contract calls for the removal of more than 162 m³ of concrete from the dam and 439 m³ for all three spillways.

Freezing Temperatures

The probability of night-time temperatures plummeting to below -20ºC is the principal concern for the sub-contractor throughout the winter months’ operations.

“Currently, in mid-October we are experiencing daytime temperatures of -9ºC,” confirmed Andreas.

“With the downstream river already frozen for the winter, the project could become a giant ice cube. Today is only -7ºC but by the night it is getting much colder.”

To prevent the hoses freezing overnight, E-Schakt has resorted to continually pass water through the high-pressure hoses throughout the night and disconnecting the power pack, pass the water into the downstream river.

A heated circuit is also maintained in the water pumps 24/7 operation and antifreeze is also applied to the hoses.

“It’s about preparing for the night-time temperature drop, otherwise we will have a real problem next morning,” he added.

First thing each morning, high-pressure air is flushed through the hoses to clear the antifreeze before reconnecting then to the power pack.

Similarly during daytime breaks for meals and meetings, equipment is kept in ‘idle’ rather than shutting down.

Throughout each 12-week contract, E-Schakt has a team of three operators working a 12-hour shift, 7 days a week on a 7-day changeover cycle.

Järpströmmen Hydropower Station

The power station was built in 1944 and features three 118 MW turbines providing 415 GWh/year of electricity for the national grid.

Featuring a fall height of 66 m to the underground plant, the turbines are fed by a waterflow of 220 m³/sec from the 156 km² lake Kallsjön, Sweden’s sixth largest lake with a depth of 134 km.

Trusted by 25,000+ job seekers

“It took my CV and asked me questions relevant to understanding what kind of jobs to suggest for me. Suggestions were almost perfect. Jobs were exactly what I’ve been looking for.”

Jessica, London

Get help applying for this job

Skills

Hydrodemolition
Concrete removal
Construction
Equipment operation
Underwater operations
Project management
Safety compliance
Maintenance
Refurbishment
Technical troubleshooting

Location

Norton sub Hamdon, England, United Kingdom

Sign up to applySee more jobs like this