Rodeo
Get started

Bilfinger UK

Senior Planner - HVP

Carrington
Posted about 19 hours ago
Sign up to applySee more jobs like this

How your CV stacks up

1Upload CV
2Analyse CV
3Improve CV

Upload your CV to see how well it fits this job role

?%

Bilfinger UK

Bilfinger UK is a leading engineering and maintenance provider, supporting customers across the chemical & petrochemical, nuclear, oil & gas, pharmaceuticals & biopharma, power & energy, utilities, renewables and food & beverage markets. We enhance the efficiency of assets, ensuring a high level of availability and reducing maintenance costs.

We have extensive experience in offshore and onshore facilities; specialising in asset management services throughout all life cycle phases from consulting, engineering, manufacturing, assembly, operations, maintenance, and decommissioning.

This commitment is delivered by an experienced and highly competent workforce of over 4,500 employees operating from 14 offices in strategic industrial hubs, upholding the highest standards of safety, compliance and quality.

Highview Power Carrington – LAES Project (FOAK)

50 MW / 300 MWh Liquid Air Energy Storage Facility | Greater Manchester

First-of-a-kind, commercial-scale greenfield delivery of a 50 MW / 300 MWh Liquid Air Energy Storage (LAES) facility, supporting long-duration energy storage and the UK’s net-zero transition.

The project utilises proprietary LAES technology, converting surplus renewable electricity into stored liquid air, with later pressurisation and reheating to drive turbines for electricity generation.

Role / Scope (Bilfinger UK)

Principal contractor for Mechanical, Electrical & Instrumentation (MEI) construction, including structural steelwork

  • Delivery of complex, safety-critical systems within a novel technology environment
  • Working within a large high-performing, multi-disciplinary integrated delivery team on a technically challenging FOAK scheme

A landmark project combining innovation, engineering excellence, and collaboration to deliver one of the UK’s most advanced energy storage assets.

Reasons to use Rodeo

I’m in my final year doing Economics and I don’t know whether to apply for grad schemes now or do a masters first. What do you think?

Honest answer — it depends on where you want to end up. A lot of top grad schemes (Big 4, civil service, banking) don’t need a masters. Let’s look at the ones you’d be competitive for now, and we can decide if a masters actually adds anything.

Also worth knowing: most autumn 2026 applications are open now. Timing matters more than you think.

Start with a chat, not a search bar

Grad scheme, placement, apprenticeship? Not sure what you want yet — that's fine. Your agent talks it through with you and turns "I have no idea" into a shortlist.

P

Graduate Consultant — 2026 Scheme

PwC·London, UK
£35,000/yr

Why you're a good match

Strong

Your economics background and your summer at a regional bank line up with what PwC looks for on the consulting scheme. Applications close in four weeks.

See breakdown
Save jobNot relevant
View details

It searches the market for you

Every day your agent scans the market matching roles against what actually matters to you, not just keywords on a CV.

Why you're a good match

You’ve got the grades and the economics background, and your bank internship is exactly the experience this scheme looks for. Apply soon — deadlines close within the month.

See breakdown
Strong

Experience fit

Your summer at the bank plus your econometrics coursework map directly to the day-one responsibilities on this scheme — client modelling, market briefings, and deal support.

See breakdown
Strong

Only hits

No noise. No "maybe this fits." Just roles with a clear explanation of why they're right — and where to focus when applying.

The Role

The Senior Planner is responsible for the creation and maintenance of all project schedules across the full lifecycle of the project, inclusive of all required supporting documentation, procedures and standards. These responsibilities range from liaising with the business development, engineering and project management teams to develop a fully cost and resource loaded schedule for tender / contractual submissions, through to the management of the periodic progress updates and submissions with all required reporting outputs.

Key Responsibilities

The responsibilities of the Senior Planner include (but are not limited to):

  • Development and management of all key scheduling processes and key documentation (inclusive of robust basis of schedule, WBS/OBS/CBS structures, Cost Accounts, activity coding structures)
  • Development and management of all required fully cost and resource loaded Primavera P6 schedules as needed for the Project, inclusive of integrated master schedules, detailed construction schedules (level 4 / 5) and periodic lookahead schedules.
  • Embedding schedule risk management best practices, ensuring that all schedules contain appropriate time risk allowances using Quantitative Schedule Risk Management Analysis (QSRA).
  • Management of the alignment and interaction between the schedule, project cost estimate / cashflow and resource forecasting and utilisation.
  • Establish effective change control management including the use of techniques such as critical path analysis and float erosion to provide early warning of potential issues.
  • To establish and manage the periodic progress capture, schedule update and submission process and outputs in-line with NEC4 requirements.
  • Development and production of all required monthly reporting outputs (e.g. planned vs actual progress reporting / narrative, S-Curves, manpower histograms)
  • Work closely with the Project Controls Manager and commercial teams to establish cost engineering systems to monitor, control and report costs (inclusive of all Earned Value Management output requirements).
  • Provide contract management support including development of bespoke and/or generic rules of credit, KPI development and monitoring, NEC programme acceptance management and production / assessment of compensation event impact schedules
  • Liaise with PMs/RDs to manage the provision of appropriate resources and expertise to successfully deliver the project control activities
  • Support the wider business with the identification and adoption of project controls best practices

Get help with your application

Your very own career expert that helps elevate your application to the next level.

Get help applying for this job

Qualifications & Experience

  • Minimum of 8 years’ experience in an EPC environment
  • NEC3/4 qualification and/or significant experience
  • Expert level capability in the use of Primavera P6 planning software
  • Capability in Microsoft 365 applications (MS Office, teams, etc.)
  • Strong communication skills both verbal and written, plus strong analytical skills

Desirable

  • BSc / BEng / MSc in Engineering, Construction Project Management or relevant subject
  • APM, AcostE or APE membership and/or qualification
  • Certified Oracle P6 Training (P102 & P106)
  • Power BI, Power Platform and SAP experience

If you wish to speak to a member of the recruitment team, please contact 01224 246246.

Email: leo.taylor@bilfinger.com

Trusted by 25,000+ job seekers

“It took my CV and asked me questions relevant to understanding what kind of jobs to suggest for me. Suggestions were almost perfect. Jobs were exactly what I’ve been looking for.”

Jessica, London

Get help applying for this job

Skills

Primavera P6
Project Scheduling
NEC4 Contract Management
Quantitative Schedule Risk Management Analysis
Earned Value Management
Critical Path Analysis
Resource Forecasting
Cost Engineering
WBS/OBS/CBS Structures
Microsoft 365
Power BI
SAP
Analytical Skills
Communication Skills
Change Control Management
Reporting

Location

Carrington, England, United Kingdom

Sign up to applySee more jobs like this